Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Performance Evidence
Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:
locates and applies applicable documentation, policies and proceduresimplements the requirements, procedures and techniques for the safe, effective and efficient completion of paver operations including:accessing, interpreting and applying documentation relevant to conducting paver operations identifying and applying relevant specifications to all work activitiesidentifying, addressing and reporting potential hazards and risksidentifying, obtaining, confirming and implementing signage requirements selecting and checking for faults all plant, tools and equipment to carry out tasks identifying, addressing and reporting environmental issues and ground conditionsworks effectively with others to undertake and complete the paver operations in a way that meets all of the required outcomes including:preparing for and organising work activities to meet all task requirementscommunicating clearly and concisely with others to receive and clarify work instructionsusing a range of communication techniques and aids to advise others of work activity and exclusion zonesmonitoring movements and hazards and identifying and communicating changes to the work environment during the work processdemonstrates completion of conducting paver operations that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:conducting paver pre-operational checks and rectifying or reporting any faultsoperating paver to work instructions to manufacturer’s design specifications and in accordance with company operating procedures relocating paver correctly and safelycarrying out operator maintenance and keeping required recordsclearing work area and disposing of, recycling or storing materialscleaning, checking, maintaining and storing plant, tools and equipmentlaying a minimum of five (5) sections of straight paving (at least one (1) of one hundred (100) metres) plus three intersections are to be placed
Knowledge Evidence