Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Performance Evidence
Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:
locates and applies applicable documentation, policies and proceduresimplements the requirements, procedures and techniques for the safe, effective and efficient setup and maintenance of concrete paver stringlines including:accessing, interpreting and applying documentation relevant to setup and maintenance of concrete paver stringlinesidentifying and applying relevant specifications to all work activitiesidentifying, addressing and reporting potential hazards and risksidentifying, obtaining, confirming and implementing signage requirements selecting and checking for faults all plant, tools and equipment to carry out tasks identifying, addressing and reporting environmental issues and ground conditionsworks effectively with others to setup and maintain concrete paver stringlines in a way that meets all of the required outcomes including:preparing for and organising work activities to meet all task requirementscommunicating clearly and concisely with others to receive and clarify work instructionsusing a range of communication techniques and aids to advise others of work activity and exclusion zonesmonitoring movements and hazards and identifying and communicating changes to the work environment during the work processdemonstrates completion of the setup and maintenance of concrete paver stringlines that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:inspecting equipment and layout for compliance with workplace specificationssetting up barricades and exclusion zones conducting placement of stringline and pins to set specificationsinstalling and removing access gates and carrying out inspectionsstoring and maintaining pins and stringline correctlyconduct concrete paver stringlines operations by:installing two (2) access pointsinstalling pins to correct height and horizontal adjustment for a minimum distance of five hundred (500) metresinstalling step-up flagstension string lines to specificationsconducting measurement checksconducting visual inspections and checksplacing at least one (1) crossoverdemonstrating the removal and storage of a string line
Knowledge Evidence