Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Performance Evidence
Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:
locates and applies relevant legislation, documentation, policies and proceduresimplements the requirements, procedures and techniques for the safe, effective and efficient completion of preparing detailed designs of sub-divisions including:accessing and interpreting plans, drawings, specifications and design briefsaccessing and interpreting engineering survey and geotechnical informationaccessing and interpreting hydrological, meteorological, cultural and heritage dataaccessing and interpreting sub-divisions construction materials test resultsaccessing and interpreting sub-divisions selection dataapplying computer aided drafting design (CADD) and drafting technologyapplying engineering graphical presentation techniquesworks effectively with others to undertake and complete the detailed design of sub-divisions that meets all the required outcomes including:complying with written and verbal reporting requirements and procedurescommunicating clearly and concisely with others to receive and clarify work instructionscommunicating clearly and concisely with others to coordinate work activitiesdemonstrates completion of detailed designs of sub-divisions that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:calculate areas, volumes, densities, mass, percentages and gradesmaintain design and cost records determining sub-divisions capacity requirementsselect sub-divisions options size sub-divisions componentsselect and apply appropriate construction techniquesdevelop and apply design plansinterpret and analyse datacomplete a detailed design of sub-divisionsprepare a cost estimateparticipate in a design reviewobtain design approvalcomplete and submitting design costreview application of design and recommending changes
Knowledge Evidence