Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Performance Evidence
Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:
locates and applies relevant documentation, policies and proceduresimplements the requirements, procedures and techniques for the safe, effective and efficient completion of constructing and maintaining basic ventilation devices including:reading, interpreting, communicating and applying technical informationidentifying, addressing and reporting environmental issues, operational issues, potential hazards and risks applying equipment/manual handling techniquesselecting and using relevant tools and equipmentcomplying with environmental, operational and statutory requirementsidentifying work requirementsapplying construction techniquesinspecting and maintaining devices, equipment and materialsworks effectively with others to undertake and complete constructing and maintaining basic ventilation devices in a way that meets all of the required outcomes including:organising work activities to meet all task requirementscommunicating clearly and concisely with others to receive and clarify work instructionscomplying with written and verbal reporting requirements and proceduresresolving coordination requirements throughout work activitiesdemonstrates completion of constructing and maintaining basic ventilation devices that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:applying construction techniques for constructing and maintaining basic ventilation devicesapplying basic construction skills to conduct remedial work to make workplace safe identifying potential strata hazards (roof and ribs)constructing and maintaining the following devices in an underground coal mine:temporary/short-term stopping; andpermanent/long-term stopping of regulator or coffin box; andmachine doorsusing materials for devices under this unit, which may include but not limited to:bratticeplasterboardhessiancanvasplastersnap jackspogo stickspropsbattensnails
Knowledge Evidence