Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare
  2. Install and recover equipment
  3. Carry out operator maintenance

Required Skills

Required skills

Specific skills are required to achieve the Performance Criteria of this unit particularly for its application in the various circumstances in which this unit may be used This includes the ability to carry out the following as required to install and recover longwall equipment

apply legislative organisation and site requirements and procedures for the installation and recovery of longwall equipment

apply operational safety requirements

access interpret apply and communicate technical information

interpret survey and geological data

apply handeye coordination

apply diagnostic and fault finding techniques

use hand tools

maintain equipment records

comply with environmental requirements

Required knowledge

Specific knowledge is required to achieve the Performance Criteria of this unit particularly for its application in the various circumstances in which this unit may be used This includes knowledge of the following as required to install and recover longwall equipment

site operational safety procedures

longwall equipment operational processes and procedures

longwall equipment characteristics uses and limitations

site geology and survey data

site ventilation systems

longwall equipment maintenance systems and procedures

site environmental requirements and constraints relevant to longwall equipment installation and recovery

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria required skills and knowledge and the range statement of this unit and include evidence of the following

knowledge of the requirements procedures and instructions for installing and recovering longwall equipment

implementation of requirements procedures and techniques for the safe effective and efficient completion of the installation and recovery of longwall equipment

working with others to undertake and complete the installation and recovery of longwall equipment in a way that meets all of the required outcomes

consistent timely completion of longwall equipment installation and recovery that safely effectively and efficiently meets the required outcomes

Context of and specific resources for assessment

This unit must be assessed in the context of the work environment Where personal safety or environmental damage are limiting factors assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance including task skills task management skills contingency management skills and job role environment skills

Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment Selection and use of resources for particular worksites may differ due to the site circumstances

The assessment environment should not disadvantage the participant For example language literacy and numeracy demands of assessment should not be greater than those required on the job

Customisation of assessment and delivery environment to sensitively accommodate cultural diversity

Aboriginal people and other people from a non English speaking background may have second language issues

Where applicable physical resources should include equipment modified for people with disabilities Access must be provided to appropriate learning andor assessment support when required

Method of assessment

This unit may be assessed in a holistic way with other units of competency The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods

written andor oral assessment of the candidates required knowledge

observed documented andor first hand testimonial evidence of the candidates

implementation of appropriate requirement procedures and techniques for the safe effective and efficient achievement of required outcomes

consistent achievement of required outcomes

first hand testimonial evidence of the candidates

working with others to undertake and complete the installation and recovery of longwall equipment

Guidance information for assessment

Consult the SkillsDMC User Guide for further information on assessment including access and equity issues


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevant compliance documentation may include:

legislative, organisational and site requirements and procedures

manufacturer's guidelines and specifications

management plans

OHS policy

Australian standards

Employment and workplace relations legislation

Equal Employment Opportunity and Disability Discrimination legislation

Work requirements may be in the form of:

shift briefings

handover details

work orders

Work requirements details may include:

equipment, including defects

cutting height

next cutting sequence

achievement targets

essential survey data

geological conditions

hazards

potential hazards

coordination requirements/issues

Mine environmental, geological and survey data may be in the form of:

ventilation/gas data

Deputy reports

geological hazard plan

survey data

Emergency situations may include:

roof and rib fall

fire

flash

explosion

outbursts

inrush

Longwall equipment to be installed or recovered may include:

pantech

AFC

pans

tailgate/maingate

breaker line supports

shearer

cables

airhoses

hydraulic chocks

bretby monorail

Hazards/potential hazards may include:

heavy machinery

gas accumulation

roof-rib

water

dust

diesel fumes

high pressure hoses

lifting

pulling equipment

heat

Equipment may include:

chock transporter

impro

mine dozer (electric or diesel)

chainblocks

winches

roof bolters

multipurpose vehicles

re-reelers

load haul dump vehicles

E-Frame

diesel locos

Coordination activities may include those with:

equipment operators

transportation operators

Operator (operational) maintenance procedures are those established and authorised for the site.