Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Establish mine ventilation system
  2. Install/construct ventilation system
  3. Monitor and maintain mine ventilation system

Required Skills

Required skills

Specific skills are required to achieve the Performance Criteria of this unit particularly for its application in the various circumstances in which this unit may be used This includes the ability to carry out the following as required to install and maintain ventilation systems and equipment

apply legislative organisation and site requirements and procedures for installing and maintaining ventilation systems and equipment

apply operational safety requirements

access interpret apply and communicate technical information

use hand and power tools

apply construction techniques

inspect and maintain equipment devices and materials

comply with environmental requirements

Required knowledge

Specific knowledge is required to achieve the Performance Criteria of this unit particularly for its application in the various circumstances in which this unit may be used This includes knowledge of the following as required to install and maintain ventilation systems and equipment

operational safety systems related to ventilation systems equipment and devices

statutory and site ventilation requirements

mine operational procedures

basic mine geology and survey information related to ventilation systems

types and applications of ventilation systems

ventilation equipment and device construction processes and operating characteristics

ventilation device equipment and material characteristics

site environmental requirements and constraints related to ventilation systems

gas monitoring and testing

air flow measurement

changing environmental conditions

risk management procedures

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria required skills and knowledge and the range statement of this unit and include evidence of the following

knowledge of the requirements procedures and instructions for installing and maintaining ventilation systems and equipment

implementation of requirements procedures and techniques for the safe effective and efficient completion of installing and maintaining ventilation systems and equipment

working with others to undertake and complete the installation and maintenance of ventilation systems and equipment that meets all of the required outcomes

consistent timely completion of ventilation systems and equipment installation and maintenance that safely effectively and efficiently meets the required outcomes

Context of and specific resources for assessment

This unit must be assessed in the context of the work environment Where personal safety or environmental damage are limiting factors assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance including task skills task management skills contingency management skills and job role environment skills

Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment Selection and use of resources for particular worksites may differ due to the site circumstances

The assessment environment should not disadvantage the participant For example language literacy and numeracy demands of assessment should not be greater than those required on the job

Customisation of assessment and delivery environment to sensitively accommodate cultural diversity

Aboriginal people and other people from a non English speaking background may have second language issues

Where applicable physical resources should include equipment modified for people with disabilities Access must be provided to appropriate learning andor assessment support when required

Method of assessment

This unit may be assessed in a holistic way with other units of competency The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods

written andor oral assessment of the candidates required knowledge

observed documented andor first hand testimonial evidence of the candidates

implementation of appropriate requirement procedures and techniques for the safe effective and efficient achievement of required outcomes

consistent achievement of required outcomes

first hand testimonial evidence of the candidates

working with others to undertake and complete the installation and maintenance of ventilation systems and equipment

Guidance information for assessment

Consult the SkillsDMC User Guide for further information on assessment including access and equity issues


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevant compliance documentation may include:

legislative, organisational and site requirements and procedures

manufacturer's guidelines and specifications

Australian standards

Employment and workplace relations legislation

Equal Employment Opportunity and Disability Discrimination legislation

Mine ventilation methods may include:

natural ventilation

mechanical ventilation

auxiliary ventilation

Ventilation equipment and devices may include:

fans

pipes

compressed air injectors

ventilation tubing

barriers

Materials for devices may include:

plastic sheeting

timber

conveyor belt

Hazards may include:

irrespirable atmospheres

noxious atmospheres

flammable

explosive mixtures

Materials/equipment may include:

grout pumps

cement mixer

compressed air drill

borer

hoses

hand tools

scaffolding

level

water traps

sampling lines

pressure gauges

gas drainage line

shut off valves

oxygen breathing apparatus

gas detection equipment

Coordination may include:

planning activities

setting priorities for activities

establishing liaison channels with other personnel, neighbouring mines, and regulatory bodies

ensuring work and safety requirements are passed to and reinforced with safety, and operational personnel and contractors

Impurities may include:

carbon monoxide

sulphur dioxide

oxides of nitrogen

radon

methane

hydrogen sulphide

diesel exhaust fumes

Contaminants may include:

pulmonary dusts

toxic dusts

explosive dusts

silica