Elements and Performance Criteria
- Plan and prepare for the construction of geothermal wells
- Access, interpret and apply compliance documentation relevant to the work activity
- Obtain, confirm and apply work instructions for the allocated task
- Identify, manage and report all potential hazards
- Resolve coordination requirements with others at the site prior to commencing and during work activities
- Discuss scope of work with client to gain general agreement on drilling plan
- Communicate regular up to date information on progress, and/or problems encountered to client and/or other relevant parties
- Provide details of the completed well to the appropriate authorities as required by the relevant state/territory legislation
- Design geothermal wells
- Determine most appropriate construction methods from the reading and interpretation of all available documented information and local geographic/geological knowledge
- Determine a drilling fluid program to suit the expected down-hole conditions and anticipated pressures/temperatures
- Select appropriate bore/surface casing for the anticipated ground conditions and construction techniques
- Ensure all necessary materials anticipated for the job are available and on site prior to commencement of construction phase
- Construct geothermal wells
- Use approved procedures to assemble and insert casing
- Use equipment for assembly safely and in accordance with approved procedures
- Grout or otherwise seal surface casing
- Conduct grouting operations to seal intermediate and/or production casing strings or to seal selected zones
- Construct well in accordance with any applicable regulations, minimum construction requirements and the organisation's internal procedures
- Maintain plumbness and alignment of the hole within the required limitations
- Recognise symptoms of a formation kick and take action to control the well
- Maintain adequate supplies of water on site to quench the well if required
- Collect, record and label formation samples
- Maintain records accurately and legibly
- Accurately calculate hole, annular, grout and mud pit volumes in cubic metres or litres
- Comply with relevant workplace occupational health and safety requirements for both the drilling equipment and construction materials
- Maintain tool string inventories
- Develop bore
- Carry out well maintenance and rehabilitation
- Decommission test/bore holes