Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare for the construction of geothermal wells
  2. Design geothermal wells
  3. Construct geothermal wells
  4. Develop bore
  5. Carry out well maintenance and rehabilitation
  6. Decommission test/bore holes
  7. Plan and prepare for the construction of geothermal wells
  8. Design geothermal wells
  9. Construct geothermal wells
  10. Develop bore
  11. Carry out well maintenance and rehabilitation
  12. Decommission test/bore holes

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant legislation, documentation, policies and procedures

works effectively with others to plan, prepare and conduct the construction of geothermal wells including:

communicating clear and timely instructions to those involved

preparing for and conducting briefings, toolbox and site meetings

maintaining clear and legible written records and the reports

demonstrates completion of the construction of geothermal wells that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

determining most appropriate construction methods from the reading and interpretation of all available documented information and local geographic/geological knowledge

selecting appropriate bore/surface casing for the anticipated ground conditions and construction techniques

completing grouting operations to seal intermediate and/or production casing strings or to seal selected zones

maintaining plumbness and alignment of the hole within the required limitations

using development techniques to prevent collapsing of casing or blow outs

carrying out the decommissioning (abandonment) of test holes or wells in geothermal systems


Knowledge Evidence

The candidate must demonstrate knowledge in, when constructing geothermal wells through:

work, health and safety

environmental issues

operating drill rig

housekeeping

the equipment characteristics, technical capabilities and limitations

the basic geological formations, i.e. basic knowledge of both soil and rock classifications and various formations which permit groundwater movement and factors affecting groundwater quality for aquifer systems, including drillability and stability

potential safety hazards and sources of contamination when siting a well

the necessity of having a signed agreement/contract with the client

applying Blow Out Prevention procedures and techniques

appropriate casing materials for various applications

managing hole preparation for cementing (grouting) operations

effects of various cement (grout) additives

using pressure cementing methods

casing collapse characteristics

applying appropriate headworks design for geothermal well applications

types of drilling fluids

using grout placement methods and procedures

applying a range of numerical calculations including:

volume (e.g. mud pits, drums, tanks or wells of given dimensions)

up hole velocity

cement/water/additives quantities

flow rates (e.g. L/sec, GPM)

conversion from imperial to metric and vice versa

required mud weight to control formation fluid pressures

appropriate fishing operations for the type(s) of drilling being undertaken

using of materials safety data sheets (MSDS)

being prepared for fire/accident/emergency