Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Performance Evidence
The candidate must demonstrate the ability to complete the tasks outlined in the elements, performance criteria and foundation skills of this unit, including evidence of the ability to:
rig-up, conduct pre-spud operations and rig down on at least two occasions, including: identifying potential rig-up problems checking drilling and hoist equipmentdetermining optimum circulating and penetration rates and checking deviationsreceiving and actioning authorisation to commence drillingidentifying potential rig-down operationscarrying out supervision of rig up, pre-spud and rig down operations that meets required outcomes.During the above, the candidate must:locate and apply required documentation, policies and proceduresimplement the requirements, procedures and techniques to rig up, conduct pre-spud operations and rig down, including:identifying, addressing and reporting potential hazards and riskschecking equipment for damage and loss by the moving contractor and reporting as requiredpreventing usage of damaged equipment as requiredidentifying, addressing and reporting environmental issues work with others to plan, prepare and conduct rig up, pre-spud and rig down operations to meet required outcomes, including:resolving coordination requirements with others at the site prior to commencing and during work activitiescarrying out pre rig-up procedure inspections within scope of own rolecoordinating movement of load and sequence of installation and location according to rig movement planpreparing for and organising work activities to meet task requirementscommunicating with others to receive and clarify work instructionsusing a range of communication techniques and aids to advise others of work activity and exclusion zones.
Knowledge Evidence
The candidate must be able to demonstrate knowledge to complete the tasks outlined in the elements, performance criteria and foundation skills of this unit, including knowledge of:
key legislation required for rigging up, conducting pre-spud operations and rigging down key policies, procedures and established requirements for rigging up, conducting pre-spud operations and rigging down, including those for: identifying and managing risksidentifying, addressing and reporting environmental issues setting up work activitysite isolation, signage and erecting barrierswork health and safetyselecting all plant, tools and equipment to carry out tasks and checking for faultscarrying out work to specificationscommunication techniques relevant to work activitiestroubleshoot during drilling programcarrying out calculations, including:quantitiesup-hole velocityspecific gravityvolumehydrostatic pressuresoptimum circulating and penetration rates.