Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare to operate a blast furnace
  2. Perform plant condition monitoring
  3. Operate a blast furnace
  4. Operate a blast furnace under abnormal conditions
  5. Plan and prepare to operate a blast furnace
  6. Perform plant condition monitoring
  7. Operate a blast furnace
  8. Operate a blast furnace under abnormal conditions

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

works effectively with others to undertake and complete the blast furnace operations that meets all of the required outcomes including:

complying with written and verbal reporting requirements and procedures

communicating clearly and concisely with others to receive and clarify work instructions and coordinate work activities

demonstrates completion of blast furnace operations that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

conducting systems and equipment pre-start checks

inspecting and monitoring plant and equipment

reporting faults

applying operating procedures

adjusting rate, feed, composition temperature and airflow of blast furnace

monitoring discharge of blast furnace