Elements and Performance Criteria
- Prepare transport unit
- Assemble and check product
- Product temperature and labelling are checked to ensure that they are correct.
- Product is assembled before unloading and put onto a pallet, if required, ensuring that product temperature is not compromised whilst product is waiting to be unloaded.
- , Product is weighed, where required. and weight recorded.
- Weighed product is re-iced, as necessary, after weighing to ensure correct temperature of product.
- Load product
- Product is carefully placed into transport unit in a manner that will ensure that the product and packaging are not compromised.
- Frozen product is carefully transferred immediately from refrigerated storage into a refrigerated transport unit that is able to maintain product at correct temperature.
- Records of product loaded, number of packs/cases/pallets, product identification codes, product temperature and consignment documentation are collected and checked.
- Documentation is returned to the supervisor at the workplace.