Elements and Performance Criteria
- Access rail track
- Permission to occupy rail track is requested from Network Control Officer
- Permission to occupy rail track is documented in accordance with Occupancy Authority requirements
- Hazards are identified, risks are assessed and control measures are implemented
- Appropriate personal protective equipment (PPE) is used conforming to Rail Infrastructure Manager requirements
- Limits of travel are determined and agreed with Network Control Officer
- Points are operated as required to gain access to the track as authorised by Network Control Officer
- Situational awareness is maintained to identify local conditions and changed circumstances
- Communication with Network Control Officer is maintained using communications rules and procedures
- Travel track vehicle on track
- Speed limit is observed for type and classification of track vehicle and type of track
- Speed is varied in accordance with local conditions
- Permission is obtained to pass signals at STOP in accordance with workplace procedures
- Position of points are identified and operated as required to establish correct direction as authorised by Network Control Officer
- Signals are identified and obeyed
- Level crossing protection equipment is operated for the safe passage of track vehicle/s in accordance with workplace procedures
- Vigilance system is operated, as required in accordance with workplace procedures
- Unsafe situations and/or emergencies are identified, and appropriate action is taken in accordance with workplace procedures
- Remove track vehicle from track
- Network Control Officer is informed when track vehicle is off and clear of track
- Occupancy Authority is correctly cancelled or fulfilled