Elements and Performance Criteria
- Position equipment and motive power unit/s
- Remote control equipment and motive power units are positioned in required locations
- Brake test is conducted on each train section with the assistance of appropriate personnel
- Front and rear train consists are coupled together to form one train, applying safeworking techniques
- Relevant OH&S requirements are followed to prevent injury and damage
- Relevant codes of practice and safeworking systems and requirements are followed
- Monitor and operate remote control equipment
- Motive power units and control system set-up are checked to ensure safe operational status
- Remote control equipment is operated and monitored in accordance with operational requirements during train movements to provide safe train handling and control
- Any operational difficulties encountered are addressed by re-establishing control of the motive power unit(s) with minimum risk to personnel and equipment
- Shut down remote control equipment