Elements and Performance Criteria
- Plan and prepare for shunting operation
- Shunt trains
- Where required, points, levers and/or switches are operated in accordance with workplace requirements
- Audible signals, hand signals and other line of sight communications are used to assist the control of train movements
- Hand, light and radio shunting commands used are responded to in accordance with workplace requirements
- Pre-movement inspection/tests are carried out prior to moving trains
- Train is shunted and positioned in accordance with operational/workplace requirements
- Following shunt movement train is secured in accordance with workplace requirements
- Couple trains
- Type of connections required are identified prior to coupling
- Trains to be coupled are positioned in accordance with operating procedures and workplace requirements
- Trains to be coupled are fully secured
- Alignment of couplers in the appropriate position for type of connection required is ensured
- Prior to coupling trains, safety requirements are ensured
- Trains are coupled in accordance with operational/workplace requirements
- Post-coupling inspection/tests are carried out in accordance with operating procedures and workplace requirements
- Uncouple trains
- Trains to be uncoupled are identified and pre-uncoupling checks and, where required, procedures are conducted in accordance with operating procedures and workplace requirements
- Prior to uncoupling trains safety requirements are ensured
- Train that will remain after uncoupling is fully secured
- Trains are uncoupled in accordance with operating procedures and workplace requirements
- Post-uncoupling inspection/tests are carried out in accordance with operating procedures and workplace requirements
- Use coupling adaptor
- Situations requiring the use of a coupling adaptor are identified in accordance with workplace procedures
- Coupling adaptor is accessed and transported to required location for use
- Prior to fitting coupling adaptor, safety requirements are ensured
- Coupling adaptor is attached to one of the trains prior to coupling in accordance with workplace procedures
- Trains are coupled in accordance with workplace procedures and coupling adaptor is secured in place
- Post-coupling inspection/tests and/or procedures are carried out in accordance with operating procedures and workplace requirements