  1. Plan work/task
  2. Prepare for work/task
  3. Perform work/task
  4. Work area operating surface is confirmed to determine the quality of ground suitability for operational use of mobile crane in accordance with workplace procedures
  5. Mobile crane rated capacity (RC) and the lifting gear Working Load Limit (WLL)are established for the load/s and work/task requirements in accordance with manufacturer requirements and workplace procedures
  6. Appropriate paths for operating the mobile crane and moving and placing load/s in work area are assessed and determined in accordance with workplace procedures
  7. Relevant hazard identification and risk elimination/control measures are applied and advised to associated personnel in accordance with workplace procedures
  8. Traffic management plan implementation is confirmed and followed in accordance with workplace procedures
  9. Appropriate communication procedures are identified and tested with associated personnel in accordance with workplace procedures
  10. All tasks are confirmed to ensure requirements for the relevant work area in accordance with a lift plan and workplace procedures
  11. Risk control measures for hazards identified are checked for implementation in accordance with the lift plan and safe work procedures
  12. Mobile crane is accessed safely in accordance with manufacturer requirements and safe work procedures
  13. Pre-start mobile crane checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with manufacturer requirements and safe work procedures
  14. Mobile crane is set up correctly with any lifting gear and stabilised as per the lift plan in accordance with relevant manufacturer requirements including load chart/s and safe work procedures
  15. Counterweight/s are set up as required in accordance with the lift plan, relevant manufacturer requirements and safe work procedures
  16. Fly jib and/or luffing fly are set up as required in accordance with specific manufacturer requirements and safe work procedures
  17. Operational checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with manufacturer requirements and safe work procedures
  18. Crane logbook is checked to confirm current compliance, is correct for the crane type, is completed and signed and required rectifications have been signed off in accordance with manufacturer requirements and safe work procedures
  19. Weather and work environment conditions are assessed to determine any impact on mobile crane operations in accordance with manufacturer requirements and safe work procedures
  20. Boom/jib and hook block is safely positioned over the load following directions from associated personnel in accordance with the lift plan and safe work procedures
  21. Main and/or auxiliary hook including any lifting gear, where required are connected to the load and used safely in accordance with the lift plan, safe work procedures and manufacturer requirements
  22. Test lift is carried out in accordance with dogging and safe work procedures
  23. Loads are transferred using relevant crane movements and tag lines as required, in accordance with lift plan and safe work procedures
  24. Load and crane movement is monitored constantly and crane is operated safely in accordance with lift plan and safe work procedures
  25. All required communication signals are correctly interpreted and followed whilst crane is operated in accordance with the lift plan and safe work procedures
  26. Load is lowered and landed safely in accordance with lift plan and safe work procedures
  27. Lifting gear is disconnected from load and crane is positioned safely and efficiently for next task in accordance with lift plan and safe work procedures
  28. Crane fly jib and counterweight is removed to storage position and secured as required in accordance with manufacturer requirements and safe work procedures
  29. Relevant motion locks and brakes are applied as required in accordance with manufacturer requirements and safe work procedures
  30. Outriggers are stowed and secured in accordance with manufacturer requirements and safe work procedures
  31. Crane is shut down and secured to prevent unauthorised access/use in accordance with safe work procedures
  32. Plates or packing are stowed and secured in accordance with safe work procedures
  33. Shut down crane checks are carried out in accordance with safe work procedures and manufacturer requirements