Elements and Performance Criteria
- Plan installation
- Prepare for installation
- Footings are prepared and excavated in compliance with standard, following workplace procedures
- Formwork is installed in compliance with standard, following workplace procedures
- Concrete reinforcing is installed in compliance with standard, following workplace procedures
- Concrete is mixed and placed in compliance with standard, following workplace procedures
- Hold down plates/bolts are placed into concrete to correct dimensions to enable fitting of overhead wiring structure
- Install components
- Components are assembled onto bridge section as required in preparation for installation
- Masts and other components are positioned and installed as required, following accepted workplace procedures
- Fastening systems are installed in compliance with standard to ensure the integrity of the overhead wiring structure
- Complete documentation