Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare to select equipment
  2. Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for the communications network area are identified, obtained and applied
  3. Arrange locations of equipment and cable routes
  4. Cable routes are planned to ensure maximum lengths in accordance with relevant industry standards and manufacturer specifications
  5. Cable routes are planned in accordance with job specifications and relevant industry standards
  6. Earthing is arranged in accordance with job specifications and relevant industry standards
  7. Select cables and equipment
  8. Cable sizes are selected for capacity and performance requirements in accordance with job specifications
  9. Earthing components are selected for earthing requirements in accordance with job specifications and relevant industry standards
  10. Network equipment is selected in accordance with WHS/OHS requirements and relevant industry standards
  11. Electronic equipment types are selected for the environment/s and performance requirements in accordance with job specifications and relevant industry standards
  12. Document communications network
  13. Communications network arrangement and specifications for all selected items are documented in accordance with workplace procedures and forwarded to relevant person/s

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Selecting and arranging equipment for LANs, comprising a distribution frame, must include at least the following:

two fibre outlets

20 sets of two data outlets

one private automatic branch exchange customer access equipment (CAE)

or Virtual PBX

one server


Performance Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least two separate occasions and include:

applying relevant work health and safety (WHS)/occupational health and safety (WHS/OHS) requirements, including using risk control measures

arranging earthing in accordance with job specifications and relevant industry standards

arranging locations of equipment and cable routes

arranging network equipment

documenting communications network

documenting installation arrangements and specifications for items selected and reasons for the selections made

documenting justifications for selections of cable and electronic equipment

planning cable routes in accordance with job specifications and relevant industry standards

preparing to select equipment

selecting appropriate earthing components

selecting cables and equipment

selecting electronic equipment types

selecting types and sizes of cables.


Knowledge Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

local area network (LAN) fundamentals

performance of copper or fibre installation and termination

customer switching system (CSS) customer access equipment (CAE)

relevant manufacturer specifications

relevant job safety assessments or risk mitigation processes

relevant WHS/OHS legislated requirements

relevant workplace documentation

relevant workplace policies and procedures

switches, hubs and routers.