Elements and Performance Criteria
- Plan to rewind three phase induction machines
- WHS/OHS risk control measures for work preparation are followed
- Scope of work is determined in accordance with workplace procedures, job specifications and relevant industry standards
- Advice is sought from work supervisor to ensure work activity is coordinated effectively with others
- Induction machine is dismantled, parts tagged and stored to prevent loss or damage
- Winding data is obtained from records or measurements of stator and recorded in accordance with workplace procedures
- Winding is stripped from stator in accordance with workplace procedures
- Materials required for the work are obtained in accordance with workplace procedures
- Tools, equipment and testing devices required for work are obtained and checked for operation and safety
- Rewind induction machines
- Machines/equipment are isolated in accordance with WHS/OHS requirements and workplace procedures
- Stator is wound and insulated to 3.3 kV standards in accordance with workplace procedures and relevant industry standards
- Machine is assembled and prepared for final testing in accordance with workplace procedures
- Methods for dealing with unplanned events are in accordance with workplace procedures
- Quality checks are conducted to ensure coils are correctly wound with correct wire number of turns and shape in accordance with workplace procedures and work instructions
- Work is completed in accordance with timeframes, environment and workplace procedures
- Work report and forms/data sheets are completed accurately in accordance with workplace procedures