Elements and Performance Criteria
- Select and design HMIcontrol system network
- Hazards are identified, WHS/OHS risks assessed, and control measures and workplace procedures are implemented in preparation for work
- Scope of HMI control system network is determined from network specifications/design brief and in consultation with relevant person/s
- Activities are planned to meet scheduled specifications/design brief timelines in consultation with person/s involved in the work
- Management tools and software are selected based on specified requirements and performance standards
- Strategies are implemented to ensure network development is carried out efficiently
- Install, configure and manage HMIcontrol system network
- Network infrastructure components are installed and configured in accordance with industry standards and variants as specified for the network
- Structural components of directory services are installed and configured in accordance with industry standards and variants as specified for the network
- Management components of network control system are configured in accordance with industry standards and requirements specified for the network
- Security components of network control system are created in accordance with industry standards and requirements specified for the network
- Network malfunctions/faults are identified and rectified using logical problem-solving techniques of complex network control system infrastructure
- Network is monitored and solutions are developed to optimise network performance and reliability in accordance with workplace procedures
- Security events are analysed and actions taken in accordance with workplace policies and protocols
- Methods for dealing with unplanned issues/problems are analysed to provide the most effective solutions in accordance with workplace procedures
- Quality of work is monitored in accordance with performance agreement/specifications and/or workplace procedures or industry standards
- Report HMInetwork administration activities
- Network service development records are maintained in accordance with workplace procedures