Elements and Performance Criteria
- Prepare to develop an electrical integrated system
- Number of control bus networks and current requirements are determined from load calculations for devices
- Appropriate placement of system devices in system scheme is determined from bus network power and load parameters whilst maintaining system stability
- Integrated system is developed to comply with regulator safety and manufacturer specifications
- Number of devices and accessories required for the system is documented using manufacturer title and identification (ID) for each component
- Relevant programming and diagnostic tools are downloaded to compatible computer and checked for accurate operation and safety
- Program integrated system devices
- Modes of programming are applied to developing the electrical integrated system in accordance with manufacturer and programming software instructions
- Manufacturer instructions and recommendations are followed when programming system devices to project specifications
- Parameters for operation of loads are programmed to project specifications within manufacturer designated range
- Programmed system database is saved and backed up in accordance with manufacturer instructions
- Load and test electrical integrated system
- Database of integrated system programs are transferred to the network in accordance with workplace procedures
- Integrated system functions are tested for compliance with project and manufacturer specifications
- Diagnostic tools are used to locate system faults, defects or anomalies
- Defects or anomalies are corrected to comply with project requirements and manufacturer specifications
- Integrated system is documented and a copy given to client/representative