Elements and Performance Criteria
- Prepare to provide solutions to polyphase electronic power control problems.
- OHS processes and procedures for a given work area are identified, obtained and understood.
- Established OHS risk control measures and procedures are followed in preparation for the work.
- The extent of polyphase electronic power control problem is determined from performance specifications and situation reports and in consultations with relevant persons.
- Activities are planned to meet scheduled timelines in consultation with others involved in the work.
- Tools, equipment and testing devices needed for the work are obtained in accordance with established procedures and checked for correct operation and safety.
- Provide solutions to polyphase electronic power control problems.
- OHS risk control measures and procedures for carrying out the work are followed.
- Knowledge of polyphase electronic power control device and circuit operation, characteristics and applications are applied to developing solutions to control problems.
- Parameters, specifications and performance requirements in relation to each polyphase electronic power control problem are obtained in accordance with established procedures.
- Approaches to resolving polyphase electronic power control problems are evaluated to provide most effective solutions.
- Methods for dealing with unexpected situations are selected on the basis of safety and specified work outcomes.
- Problems are solved efficiently without waste of materials or damage to apparatus and the surrounding environment or services and using sustainable energy practices.
- Test and document solutions to polyphase electronic power control.
- OHS risk control measures and procedures for carrying out the work are followed.
- Solutions to polyphase electronic power control problems are tested to determine their effectiveness and modified where necessary.
- Adopted solutions are documented including instruction for their implementation that incorporates risk control measure to be followed. (See Note)
- Justification for solutions used to solve polyphase electronic power control problems are documented in accordance with established procedures.
- Note:A license to practice in the workplace is required for work involving direct access to plant and equipment connected to installation wiring at voltages above 50 V a.c. or 120 V d.c.