Elements and Performance Criteria
- Prepare to program and commission
- OHS procedures for a given work area are identified, obtained and understood.
- Established OHS risk control measures and procedures are followed in preparation for the work.
- Safety hazards which have not previously been identified are documented and risk control measures devised and implemented in consultation with appropriate personnel.
- The extent of programming and commissioning is determined from reports and other documentation and fro discussion with appropriate personnel
- Appropriate personnel are consulted to ensure the work is co-ordinated effectively with others involved on the work site
- Tools, equipment and testing devices needed to program and commission are obtained in accordance with established procedures and checked for correct operation and safety.
- Program and commission
- OHS risk control measures and procedures for carrying out the work are followed.
- The need to test or measure live is determined in strict accordance with OHS requirements and when necessary conducted within established safety procedures
- Circuits/machines/plant are checked as being isolated where necessary in strict accordance OHS requirements and procedures
- Security closed circuit television functions are entered into the system in accordance with design specifications.
- Security closed circuit television devices are checked for correct location and alignment.
- Security closed circuit televisions are tested in accordance with commissioning requirements.
- Sources of closed circuit television anomalies are identified and corrected.
- Decisions for dealing with unexpected situations are made from discussions with appropriate persons and job specifications and requirements.
- Methods for dealing with unexpected situations are selected on the basis of safety and specified work outcomes.
- Programming and commissioning activities are carried out efficiently without waste of materials or damage to apparatus and the surrounding environment or services and using sustainable energy practices.
- Complete and report programming and commissioning activities
- OHS work completion risk control measures and procedures are followed.
- Work site is made safe in accordance with established safety procedures.
- 'As-installed' security closed circuit television system is documented and an appropriate person or persons notified in accordance with established procedures