Elements and Performance Criteria
- Prepare to work on temperature measurement components and systems
- OHS procedures for a given work area are identified, obtained and understood
- OHS risk control work preparation measures and procedures are followed.
- The nature of the temperature measurement problem is obtained from documentation or from an appropriate person to establish the scope of work to be undertaken.
- Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved or affected by the work.
- Sources of materials that may be required for the work are established in accordance with established procedures.
- Tools, equipment and testing devices needed to carry out the work are obtained and checked for correct operation and safety
- Solve temperature measurement problems
- OHS risk control work measures and procedures are followed.
- The need to test or measure any electrical components live is determined in strict accordance with OHS requirements and when necessary conducted within established safety procedures
- Temperature measurement apparatus are checked as being isolated where necessary in strict accordance OHS requirements and procedures
- Established methods are used to solve measurement problems from tests and calculated values as they apply to flow measurement components and systems.
- Unexpected situations are dealt with safely and with the approval of an authorised person.
- Problems are solved using sustainable energy principles and without damage to apparatus, the surrounding environment or services.
- Complete work and document work activities
- OHS work completion risk control measures and procedures are followed.
- Work site is cleaned and made safe in accordance with established procedures.
- Written justification is made for solutions to flow measurement problems.
- Work completion is documented and appropriate person(s) notified in accordance with established procedures.