Elements and Performance Criteria
- Prepare to assemble and wire internal signalling equipment
- OHS procedures for a given work area are identified, obtained and understood.
- Established OHS risk control measures and procedures are followed in preparation for the work.
- Safety hazards that have not previously been identified are noted, and established risk control measures are implemented.
- Technical requirements relating to specific signalling equipment are established.
- Assembly and wiring is appropriately sequenced in accordance with job schedule
- Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site
- Materials needed for assembly and wiring are obtained in accordance with established procedures and checked against job requirements
- Tools, equipment and testing devices needed to assemble and wire equipment are obtained in accordance with established procedures and checked for correct operation and safety
- Assemble signalling equipment
- OHS risk control measures and procedures for carrying out the work are followed.
- Equipment is assembled to comply with technical standards and job specifications and requirements.
- Established methods for dealing with unexpected situations are discussed with appropriate person(s) and documented.
- Unexpected situations are dealt with safely and with the approval of an authorised person.
- Equipment is assembled efficiently without waste of materials or damage to apparatus and the surrounding environment or services and using sustainable energy practices.
- Wire and connect internal equipment
- OHS risk control measures and procedures for carrying out the work are followed.
- Equipment is wired, connected and labelled to comply with technical standards, job specifications and requirements.
- Established methods for dealing with unexpected situations are discussed with appropriate person(s) and documented.
- Unexpected situations are dealt with safely and with the approval of an authorised person.
- Equipment is wired and connected efficiently without waste of materials or damage to apparatus and the surrounding environment or services and using sustainable energy practices.
- Test wiring and terminations
- OHS work completion risk control measures and procedures are followed.
- All terminations are tested in accordance with appropriate testing procedures to ensure tightness and functionality.
- Mandatroy continuity and insulation tests are carried out at the workplace as per appropriate test procedures to ensure and verify system standards are met.
- Documentations including wiring diagrams are completed to establish procedures and requirements to ensure quality and safety issues are addressed.