Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare to commission hydronic systems for refrigeration/air conditioning
  2. WHS/OHS risk control measures and procedures for work are followed
  3. Safety hazards not previously identified are risk assessed and documented and risk control measures implemented
  4. Appropriate person/s is consulted to ensure the work is coordinated effectively with others involved on the worksite
  5. System operating parameters are identified by reviewing system specifications and component technical data
  6. Tools, equipment and testing devices required for the work are obtained and checked for correct operation and safety in accordance with workplace procedures
  7. Preparatory work is checked to ensure damage has not occurred and is compliant with requirements
  8. Need to test or measure live work is determined in accordance with workplace procedures and WHS/OHS requirements
  9. Circuits are checked as being isolated in accordance with WHS/OHS requirements and workplace procedures
  10. Commission hydronic systems for refrigeration/air conditioning
  11. Testing/measuring devices are connected and set up in accordance with requirements for a particular system
  12. Measurements and adjustments are made to equipment components and controls to provide optimum system performance in accordance with system specifications and regulatory requirements
  13. Decisions for dealing with unexpected situations are made from discussions with appropriate person/s, job specifications and requirements
  14. Unplanned situations are responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment
  15. Commissioning is carried out efficiently without waste of materials or damage to apparatus, the surrounding environment or services applying sustainable energy principles
  16. Complete and report commissioning activities
  17. Worksite is cleaned and made safe in accordance with workplace procedures
  18. Adjustment settings and results of commissioning work are documented and appropriate person/s notified in accordance with workplace procedures

Performance Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least one occasion and include:

identifying system operating parameters

measuring and adjusting system components and controls to provide optimum system performance

ensuring system operates within regulatory requirements

documenting adjustment settings with established procedures

dealing with unplanned events

applying relevant legislation, industry standards, codes of practice and regulations

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements, including:

applying safe working practices

applying sustainable energy principles and practices

hazard identification and reporting

implementing risk control measures

commissioning hydronic systems for refrigeration and/or air conditioning systems

completing and reporting commissioning activities

determining need to test or measure live work

isolating circuits

preparing to commission hydronic systems for refrigeration/air conditioning

using relevant tools, equipment and testing devices.


Knowledge Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

hydronic system commissioning, safe working practices and relevant standards, codes and regulations, including:

commissioning fundamentals:

building specifications/requirements/responsibilities

design and ‘as-installed’ drawings

building codes

local government regulations

design conditions

pre- commissioning checks

calibration of instruments

commissioning procedures

data collection, recording and documentation

reporting procedures

hydronic systems operation:

closed/open systems

pump head/lift and static head (high-rise building)

system friction losses

nett positive suction head

system curves

pumps:

types

selection criteria

performance characteristics

pump curves and system curves

pump testing

capacity calculations

bladder tanks

coil characteristics

heat exchangers: plate, shell and tube, and tube in tube

flow measurements: types

flow switchers

cooling towers: elementary cooling thermodynamics and types

valves - flow control devices:

types and applications

balancing valves

throttling characteristics

flow measurements

selection and applications

piping systems:

balancing and commissioning

air venting

water treatment

vacuum breaking and air breaks

relevant manufacturer specifications

relevant safe work method statements (SWMS)/job safety assessments or risk mitigation processes

relevant tools, equipment and testing devices

relevant WHS/OHS legislated requirements, including:

environmental and sustainable energy principles and practices

risk control measures

relevant workplace documentation

relevant workplace policies and procedures.