Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Complete work
  2. Plan and prepare for work
  3. Occupational Health and Safety(OHS)/Work, Health and Safety (WHS) regulations, legislative requirements, industry standards, codes of practice, manufacturers' specifications, environmental obligations and workplace procedures are reviewed in preparation for work
  4. Resources for work activities are obtained and inspected for compliance with job specification
  5. Relevant plans, drawings and manuals are selected and used, in accordance with the workplace procedures
  6. Correct materials and components for work are obtained and inspected, in accordance with workplace procedures, for compliance with job specification
  7. Work is planned, sequenced and prioritised, in accordance with workplace procedures
  8. Potential hazards are identified, and risk control measures are selected and implemented, in accordance with workplace procedures
  9. Work area is prepared, in accordance with workplace procedures
  10. Remove industrialfan for maintenance
  11. Industrial fans are disconnected, in accordance with workplace procedures
  12. Industrial fans are removed, in a manner which will assist in replacement, in accordance with workplace procedures
  13. Industrial fans are inspected for abnormalities, in accordance with workplace procedures
  14. Maintain industrial fans
  15. Components are disassembled or assembled and preliminary balance of equipment is obtained, maintained and adjusted by assembling components of an appropriate weight, in accordance with workplace procedures and manufacturers' specification
  16. Sketches are made, data noted and components are marked for identification or reassembly, in accordance with workplace procedures
  17. New components are obtained and inspected for compliance with manufacturers' specification, in accordance with workplace procedures
  18. Dimensional inspection is performed with precision measuring devices to ensure compliance with manufacturers' specifications and results are recorded, in accordance with workplace procedures
  19. Industrial fans are reassembled, applying appropriate principles and techniques, in accordance with workplace procedures and manufacturers' specifications
  20. Modifications or alterations to industrial fans are undertaken, in accordance with workplace procedures
  21. Replaceorinstall industrialfans
  22. Industrial fans are replaced, in accordance with workplace procedures and manufacturers' specification
  23. Industrial fans are levelled, aligned, coupled and connected, in accordance with workplace procedures
  24. All fastenings are torqued, in accordance with workplace procedures and manufacturers' specification
  25. Machinery, plant and industrial fans are given a test run, monitored and adjusted, as required, in accordance with workplace procedures and manufacturers' specification
  26. Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures
  27. Tools and equipment are maintained and stored, in accordance with workplace procedures
  28. Work completion details are finalised, in accordance with workplace procedures