Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Complete work
  2. Plan and prepare for work
  3. Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, legislative requirements, industry standards, codes of practice, manufacturers' specifications, environmental obligations and workplace procedures are reviewed in preparation for work
  4. Resources are obtained and inspected for compliance with job specification
  5. Relevant plans, drawings and manuals are selected and used, in accordance with workplace procedures
  6. Correct materials and components for work are obtained and inspected, in accordance with workplace procedures, for compliance with job specification
  7. Work is planned, sequenced and prioritised, in accordance with workplace procedures
  8. Potential hazards are identified and risk control measures are selected and implemented, in accordance with the workplace procedures
  9. Work area is prepared, in accordance with workplace procedures
  10. Conduct in-service testing
  11. Faults are located, in accordance with workplace procedures, using appropriate tools, equipment and testing techniques
  12. Testing and fault finding results are analysed, in accordance with workplace procedures, to establish repairs or ascertain serviceability of material crusher
  13. Remove equipment to facilitate maintenance
  14. Material crushers are disconnected, in accordance with workplace procedures
  15. Material crusher components are removed, in a manner which will assist in replacement, in accordance with workplace procedures
  16. Material crusher components are inspected for abnormalities, in accordance with workplace procedures
  17. Maintain material crushers
  18. Sketches are made, data noted and components are marked for identification for reassembly or overhaul, in accordance with workplace procedures
  19. Dimensional inspection is performed, in accordance with workplace procedures, using precision measuring devices to determine compliance with relevant drawings and/or manufacturers' specification
  20. New components are inspected for compliance with manufacturers' specification and are prepared for assembly, in accordance with workplace procedures
  21. Components are weighed, measured and recorded, in accordance with workplace procedures and site requirements
  22. Components are reassembled and preliminary balance of equipment is obtained, maintained and adjusted by assembling components sequentially by appropriate weight, in accordance with workplace procedures
  23. Plant and machinery is adjusted using appropriate techniques, in accordance with workplace procedures, manufacturers' specification and site tolerances
  24. All fastenings are torqued, in accordance with workplace procedures and manufacturers' specifications
  25. Components are levelled and aligned, using appropriate tools, in accordance with workplace procedures
  26. Replace/install material crushers
  27. Material crushers are replaced, in accordance with workplace procedures and manufacturers' specification
  28. Alterations or corrections are undertaken, in accordance with workplace procedures
  29. Material crushers are levelled, aligned and coupled, in accordance with workplace procedures
  30. All fastenings are torqued, in accordance with workplace procedures, manufacturers' specification and site requirements
  31. Material crushers are given a test run and are monitored, as required, in accordance with workplace procedures and manufacturers' specification
  32. Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures
  33. Tools and equipment are cleaned, maintained and stored, in accordance with workplace procedures
  34. Work completion details are finalised, in accordance with workplace procedures