Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Complete work
  2. Plan and prepare for work
  3. Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, legislative requirements, industry standards, codes of practice, manufacturers’ specifications, environmental obligations and workplace procedures are reviewed in preparation for work
  4. Resources are obtained and inspected for compliance with job specification
  5. Relevant plans, drawings and manuals are selected and used, in accordance with workplace procedures
  6. Correct materials and components for work are obtained and inspected, in accordance with workplace procedures, for compliance with job specification
  7. Work is planned, sequenced and prioritised, in accordance with workplace procedures
  8. Potential hazards are identified and risk control measures are selected and implemented, in accordance with workplace procedures
  9. Work area is prepared, in accordance with workplace procedures
  10. Assess engine condition
  11. Internal combustion engine condition is tested whilst under load, using appropriate test equipment, in accordance with workplace procedures and manufacturers' specification
  12. Remove auxiliary systems
  13. Auxiliary systems are removed, marked and labelled, to facilitate replacement, in accordance with workplace procedures
  14. Load device is uncoupled and removed, in accordance with workplace procedures
  15. Overhauland maintain engine
  16. Internal combustion engine components are examined, and dimensional inspection is performed, in accordance with workplace procedures, to determine conformance to manufacturers' specification
  17. Faulty components are replaced, in accordance with manufacturers' specification
  18. Internal combustion engine components are reassembled, and necessary adjustments are made, in accordance with workplace procedures and manufacturers' specification
  19. Replace auxiliary systems
  20. Auxiliary equipment is maintained, as required, in accordance with workplace procedures and manufacturers' specification
  21. Auxiliary equipment is aligned and installed, in accordance with workplace procedures and manufacturers' specification
  22. Internal combustion engine is started and function tested, in accordance with workplace procedures and manufacturers' specification
  23. Internal combustion engine operating characteristics are monitored, recorded and adjustments are made to obtain optimum performance, in accordance with workplace procedures and manufacturers' specification
  24. Auxiliary equipment and/or components are overhauled, as required, in accordance with workplace procedures and manufacturers' specification
  25. Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures
  26. Tools and equipment are cleaned, maintained and stored, in accordance with workplace procedures
  27. Work completion details are finalised, in accordance with workplace procedures