Elements and Performance Criteria
- Plan and prepare for the work
- Work requirements are identified from request/work orders or equivalent and clarified/confirmed with appropriate parties or by site inspection
- Occupational Health and Safety standards, statutory requirements, relevant Australian standards, codes of practice, manufacturers' specifications, environmental requirements and enterprise procedures are identified, applied and monitored throughout the work procedure
- Resources required to satisfy the work plan are identified, obtained and inspected for compliance with the job specifications
- Relevant plans, drawings and texts are selected and interpreted in accordance with the work plan
- Correct size, type and quantity of materials/components are determined, obtained and inspected for compliance with the job specifications
- Work is planned in detail including sequencing and prioritising and considerations made, where appropriate, for the maintenance of plant security and capacity in accordance with system/site requirements
- Coordination requirements, including requests for isolations where appropriate, are resolved with others involved, affected or required by the work
- Potential hazards are identified and prevention and/or control measures are selected in accordance with the work plan and site procedures
- Work area is prepared in accordance with work requirements and site procedures
- Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of on-the-job training
- Assess engine condition
- Remove auxiliary systems
- Overhaul/maintain engine
- Engine is systematically dismantled and component parts are clearly marked for identification in accordance with the work plan
- Engine components are examined and dimensional inspection is performed to determine conformance to manufacturer specifications
- Faulty components are replaced in accordance with manufacturer specifications
- Engine components are reassembled and necessary adjustments made in accordance with manufacturer specifications and enterprise requirements
- Replace auxiliary systems
- Load device is coupled in accordance with manufacturer specifications and enterprise requirements
- Auxiliary equipment is maintained as required in accordance with manufacturer specifications and the work plan
- Auxiliary equipment is aligned and installed in accordance with manufacturer specifications and the work plan
- Engine is started and function tested in accordance with manufacturer specifications and enterprise requirements
- Engine operating characteristics are monitored, recorded and adjustments made as required to obtain optimum performance in accordance with manufacturer specifications and enterprise requirements
- Where appropriate auxiliary equipment and/or components are overhauled in accordance with manufacturer specifications and enterprise requirements
- Complete the work
- Work is completed and appropriate personnel notified in accordance with site/enterprise requirements
- Work area is cleared of waste, cleaned, restored and secured in accordance with site/enterprise procedures
- Plant, tools and equipment are maintained and stored in accordance with site/enterprise procedures
- Work completion details are finalised in accordance with site/enterprise procedures