Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
- Test wiring systems
- Isolations for work are confirmed, in accordance with workplace procedures and site requirements
- Wiring systems are tested, in accordance with workplace procedures, plans, drawings and manuals
- Wiring systems, including enclosures and supports, are inspected prior to testing, to ensure absence of damage, defect and deterioration, in accordance with workplace procedures
- Fixed wiring is tested, as appropriate, in accordance with workplace procedures, and the results are documented to confirm compliance with job specification
- Test equipment
- Isolations are confirmed, in accordance with workplace procedures and site requirements
- Instrumentation equipment is tested, in accordance with workplace procedures, plans, drawings and manuals
- Test conditions are confirmed and the equipment is inspected, in accordance with workplace procedures, to ensure absence of damage, defects and deterioration
- Instrumentation equipment is tested using appropriate test techniques, in accordance with workplace procedures
- Instrumentation equipment test results are documented, in accordance with workplace procedures, to confirm compliance with job specification
- Commission equipment
- Isolations are confirmed, in accordance with workplace procedures and site requirements
- Instrumentation equipment is commissioned, in accordance with workplace procedures, using appropriate plans, drawings and manuals
- Instrumentation equipment is set up, in accordance with workplace procedures, operational requirements and manufacturers' specifications
- Testing and monitoring procedures are followed, in accordance with workplace procedures, and results are monitored and documented to ensure equipment operates within job specification
- Instrumentation equipment is commissioned, in accordance with workplace procedures
- Final inspection is carried out, in accordance with workplace procedures
- Complete work
- Plan and prepare for work
- Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, legislative requirements, industry standards, codes of practice, manufacturers’ specifications, environmental obligations and workplace procedures are reviewed in preparation for work
- Resources are obtained and inspected for compliance with job specification
- Relevant plans, drawings and manuals are selected and used, in accordance with workplace procedures
- Correct materials and components for work are obtained and inspected, in accordance with workplace procedures, for compliance with job specification
- Work is planned, sequenced and prioritised, in accordance with workplace procedures
- Potential hazards are identified and risk control measures are selected and implemented, in accordance with workplace procedures
- Work area is prepared, in accordance with workplace and site procedures
- Wiring systems are tested, in accordance with workplace procedures, plans, drawings and manuals
- Wiring systems, including enclosures and supports, are inspected prior to testing, to ensure absence of damage, defect and deterioration, in accordance with workplace procedures
- Fixed wiring is tested, as appropriate, in accordance with workplace procedures, and the results are documented to confirm compliance with job specification
- Test piping and tubing systems
- Piping and tubing systems are tested, in accordance with workplace procedures, plans, drawings and manuals
- Piping and tubing systems, including enclosures and supports, are inspected prior to testing, in accordance with workplace procedures, to ensure absence of damage, defects or deterioration
- Fixed piping and tubing is tested, as appropriate, in accordance with workplace procedures, and results are documented to confirm compliance with job specification
- Instrumentation equipment is tested, in accordance with workplace procedures, plans, drawings and manuals
- Test conditions are confirmed and the equipment is inspected, in accordance with workplace procedures, to ensure absence of damage, defects and deterioration
- Instrumentation equipment is tested using appropriate test techniques, in accordance with workplace procedures
- Instrumentation equipment test results are documented, in accordance with workplace procedures, to confirm compliance with job specification
- Instrumentation equipment is commissioned, in accordance with workplace procedures, using appropriate plans, drawings and manuals
- Instrumentation equipment is set up, in accordance with workplace procedures, operational requirements and manufacturers' specifications
- Testing and monitoring procedures are followed, in accordance with workplace procedures, and results are monitored and documented to ensure equipment operates within job specification
- Instrumentation equipment is commissioned, in accordance with workplace procedures
- Final inspection is carried out, in accordance with workplace procedures
- Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures
- Tools and equipment are cleaned, maintained and stored, in accordance with workplace procedures
- Work completion details are finalised, in accordance with workplace procedures