Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Test wiring systems
  2. Test equipment
  3. Commission equipment
  4. Complete work
  5. Plan and prepare for work
  6. Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, legislative requirements, industry standards, codes of practice, manufacturers’ specifications, environmental obligations and workplace procedures are reviewed in preparation for work
  7. Resources are obtained and inspected for compliance with job specification
  8. Relevant plans, drawings and manuals are selected and used, in accordance with workplace procedures
  9. Correct materials and components for work are obtained and inspected, in accordance with workplace procedures, for compliance with job specification
  10. Work is planned, sequenced and prioritised, in accordance with workplace procedures
  11. Potential hazards are identified and risk control measures are selected and implemented, in accordance with workplace procedures
  12. Work area is prepared, in accordance with workplace and site procedures
  13. Wiring systems are tested, in accordance with workplace procedures, plans, drawings and manuals
  14. Wiring systems, including enclosures and supports, are inspected prior to testing, to ensure absence of damage, defect and deterioration, in accordance with workplace procedures
  15. Fixed wiring is tested, as appropriate, in accordance with workplace procedures, and the results are documented to confirm compliance with job specification
  16. Test piping and tubing systems
  17. Piping and tubing systems are tested, in accordance with workplace procedures, plans, drawings and manuals
  18. Piping and tubing systems, including enclosures and supports, are inspected prior to testing, in accordance with workplace procedures, to ensure absence of damage, defects or deterioration
  19. Fixed piping and tubing is tested, as appropriate, in accordance with workplace procedures, and results are documented to confirm compliance with job specification
  20. Instrumentation equipment is tested, in accordance with workplace procedures, plans, drawings and manuals
  21. Test conditions are confirmed and the equipment is inspected, in accordance with workplace procedures, to ensure absence of damage, defects and deterioration
  22. Instrumentation equipment is tested using appropriate test techniques, in accordance with workplace procedures
  23. Instrumentation equipment test results are documented, in accordance with workplace procedures, to confirm compliance with job specification
  24. Instrumentation equipment is commissioned, in accordance with workplace procedures, using appropriate plans, drawings and manuals
  25. Instrumentation equipment is set up, in accordance with workplace procedures, operational requirements and manufacturers' specifications
  26. Testing and monitoring procedures are followed, in accordance with workplace procedures, and results are monitored and documented to ensure equipment operates within job specification
  27. Instrumentation equipment is commissioned, in accordance with workplace procedures
  28. Final inspection is carried out, in accordance with workplace procedures
  29. Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures
  30. Tools and equipment are cleaned, maintained and stored, in accordance with workplace procedures
  31. Work completion details are finalised, in accordance with workplace procedures