Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Test wiring systems
  2. Test equipment
  3. Commission equipment
  4. Plan and prepare for work
  5. Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, legislative requirements, industry standards, codes of practice, manufacturers’ specifications, environmental obligations and workplace procedures are reviewed in preparation for work
  6. Resources are obtained and inspected for compliance with job specification
  7. Relevant plans, drawings and manuals are selected and used, in accordance with workplace procedures
  8. Correct materials and components for work are obtained and inspected for compliance with job specification
  9. Work is planned, sequenced and prioritised, in accordance with workplace procedures
  10. Potential hazards are identified and risk control measures are selected and implemented, in accordance with workplace procedures
  11. Work area is prepared, in accordance with workplace and site procedures
  12. Wiring systems are tested, in accordance with workplace procedures, plans, drawings and manuals
  13. Wiring systems, including enclosures and supports, are inspected prior to testing, in accordance with workplace procedures, to ensure absence of damage, defects and deterioration
  14. Fixed wiring is tested, in accordance with workplace procedures and results are documented to confirm compliance with job specification
  15. Test piping and tubing systems
  16. Piping and tubing systems are tested, in accordance with workplace procedures, plans, drawings and manuals
  17. Piping and tubing systems, including enclosures and supports are inspected prior to testing, in accordance with workplace procedures, to ensure absence of damage, defects and deterioration
  18. Fixed piping and tubing is tested, in accordance with workplace procedures and results are documented to confirm compliance with job specification
  19. Complex instrumentation equipment is tested, in accordance with workplace procedures, using plans, drawings and manuals
  20. Test conditions are confirmed and complex instrumentation equipment is inspected, in accordance with workplace procedures to ensure absence of damage, defects or deterioration
  21. Complex instrumentation equipment is tested, in accordance with workplace procedures, using appropriate techniques
  22. Complex instrumentation equipment test results are documented to confirm compliance with job specification
  23. Complex instrumentation equipment is commissioned, in accordance with workplace procedures, plans, drawings and manuals
  24. Complex instrumentation equipment is set up, in accordance with workplace procedures, operational requirements and manufacturers' specifications
  25. Testing and monitoring is implemented, in accordance with workplace procedures and the results are monitored and documented to ensure equipment operates to manufacturers' specifications