Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Test wiring systems
  2. Complete work
  3. Plan and prepare for work
  4. Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, legislative requirements, industry standards, codes of practice, manufacturers’ specifications, environmental obligations and workplace procedures are reviewed in preparation for work
  5. Resources are obtained and inspected for compliance with job specification
  6. Relevant plans, drawings and manuals are selected and used, in accordance with workplace procedures
  7. Correct materials and components for work are obtained and inspected, in accordance with workplace procedures, for compliance with job specification
  8. Work is planned, sequenced and prioritised, in accordance with workplace procedures
  9. Potential hazards are identified, and risk control measures are selected and implemented, in accordance with the workplace procedures
  10. Work area is prepared, in accordance with workplace procedures
  11. Wiring systems are tested, in accordance with workplace procedures, plans, drawings and manuals
  12. Wiring systems, including enclosures and supports, are inspected, in accordance with workplace procedures, prior to testing to ensure absence of damage, defect or deterioration
  13. Fixed wiring is tested, in accordance with workplace procedures, and results are documented to confirm compliance with job specification
  14. Test piping and tubing systems
  15. Piping and tubing systems are tested, in accordance with workplace procedures, plans, drawings and manuals
  16. Piping and tubing systems, including enclosures and supports, are inspected, in accordance with workplace procedures, prior to testing to ensure absence of damage, defects or deterioration
  17. Fixed piping and tubing is tested, in accordance with workplace procedures and results are documented to confirm compliance with job specification
  18. Test electronic instrumentationequipment
  19. Electronic instrumentation equipment is tested, in accordance with workplace procedures, plans, drawings and manuals
  20. Test conditions are confirmed and equipment is inspected, in accordance with workplace procedures, to ensure absence of damage, defect or deterioration
  21. Electronic instrumentation equipment test results are documented to confirm compliance with job specification
  22. Commission electronic instrumentationequipment
  23. Electronic instrumentation equipment is commissioned, in accordance with workplace procedures, using appropriate plans, drawings and manuals
  24. Electronic instrumentation equipment is set up, in accordance with workplace procedures, operational requirements and manufacturers' specifications
  25. Testing and monitoring results are monitored and documented, in accordance with workplace procedures, to ensure equipment functions within manufactures' specifications
  26. Electronic instrumentation equipment is commissioned, in accordance with workplace procedures
  27. Final inspection is carried out, in accordance with workplace procedures
  28. Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures