Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Test system
  2. Commission system
  3. Complete work
  4. Plan and prepare for work
  5. Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, legislative requirements, industry standards, codes of practice, manufacturers’ specifications, environmental obligations and workplace procedures are reviewed in preparation for work
  6. Resources are obtained and inspected for compliance with job specification
  7. Relevant plans, drawings and manuals are selected and used, in accordance with workplace procedures
  8. Correct materials and components for work are obtained and inspected for compliance with job specification
  9. Plan for commissioning of wind turbine control system is developed, in accordance with workplace procedures, including sequencing and prioritising
  10. Potential hazards are identified and risk control measures are implemented, in accordance with workplace procedures
  11. Work area is prepared in accordance with workplace procedures
  12. Test systems equipment
  13. Wind turbine control system equipment is visually inspected to ensure absence of any damage, defects or deterioration, in accordance with workplace procedures and commissioning plan
  14. Wind turbine control system equipment is tested, in conjunction with other related systems and equipment, to ensure correct operation, in accordance with workplace procedures and commissioning plan
  15. Wind turbine control system wiring system is checked and tested, in conjunction with other related systems and equipment, in accordance with workplace procedures and commissioning plan
  16. Wind turbine control system is visually inspected to ensure absence of any damage, defects or deterioration, in accordance with workplace procedures and commissioning plan
  17. Wind turbine control system is tested using appropriate plans, drawings and manuals, in accordance with workplace procedures and commissioning plan
  18. Wind turbine control system is tested, in conjunction with other related systems and equipment, in accordance with workplace procedures and commissioning plan
  19. Wind turbine control system test results are interpreted and documented, in accordance with workplace procedures, to confirm compliance with commissioning plan
  20. Wind turbine control system plant and equipment is set up, in accordance with workplace procedures, to meet operational requirements and manufacturers' specifications
  21. Wind turbine control system is set up, in accordance with workplace procedures, to meet operational requirements and manufacturers' specifications
  22. Wind turbine control system plans, drawings and manuals are used, in accordance with workplace procedures and commissioning plan
  23. Wind turbine control system equipment is commissioned, in accordance with workplace procedures and commissioning plan
  24. Faulty wind turbine control system equipment is repaired, or reported, in accordance with workplace procedures
  25. Final inspection is carried out, in accordance with workplace procedures
  26. Work area is cleared of waste, cleaned, restored and secured in accordance with workplace procedures
  27. Tools and equipment are maintained and stored, in accordance with workplace procedures
  28. Work completion details are finalised in accordance with workplace procedures