Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Complete work
  2. Plan and prepare for work
  3. Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, legislative requirements, industry standards, codes of practice, manufacturers' specifications, environmental obligations and workplace procedures are reviewed in preparation for work
  4. Resources are obtained and inspected for compliance with job specification
  5. Relevant plans, drawings and manuals are selected and used, in accordance with workplace procedures
  6. Work is planned, sequenced and prioritised, in accordance with workplace procedures
  7. Work area is prepared, in accordance with workplace procedures
  8. Conduct maintenance on wind turbine generatorelectrical systems
  9. Documented service checklists, or similar are followed, in accordance with workplace procedures
  10. Diagnostic testing and data from monitoring systems is used to identify those components requiring maintenance
  11. Wind turbine generator equipment is dismantled, if required, for maintenance, in accordance with manufacturers' specifications and workplace procedures
  12. Techniques are used to enable identification or reassembly of wind turbine generator equipment, in accordance with workplace procedures
  13. New components are obtained, if required, and are inspected for compliance with manufacturers' specifications
  14. Wind turbine generator equipment is tested, monitored and adjusted, if required, in accordance with workplace procedures and manufacturers' specifications
  15. Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures
  16. Tools and equipment are maintained and stored, in accordance with workplace procedures
  17. Work completion details are finalised, in accordance with workplace procedures