Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Test system
  2. Complete work
  3. Plan and prepare for work
  4. Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, legislative requirements, industry standards, codes of practice, manufacturers’ specifications, environmental obligations and workplace procedures are reviewed in preparation for work
  5. Resources are obtained and inspected for compliance with job specification
  6. Relevant plans, drawings and manuals are selected and used, in accordance with workplace procedures
  7. Correct materials and components for work are obtained and inspected for compliance with job specification
  8. Commissioning is planned, sequenced and prioritised, in accordance with workplace procedures
  9. Potential hazards are identified and risk control measures are implemented, in accordance with workplace procedures
  10. Work area is accessed and prepared, in accordance with workplace procedures
  11. Test systems equipment
  12. Wind turbine generator system equipment is visually inspected to ensure absence of any damage, defects and deterioration, in accordance with workplace procedures and commissioning plan
  13. Wind turbine generator system equipment is tested, in conjunction with other related systems and equipment, to ensure correct operation, in accordance with workplace procedures and commissioning plan
  14. Wind turbine generator wiring systems are checked and tested, in conjunction with other related systems and equipment, in accordance with workplace procedures and commissioning plan
  15. Wind turbine generator system, plant and equipment are set up and calibrated, in accordance with workplace procedures, operational requirements and manufacturers' specifications
  16. Wind turbine generator system is commissioned using appropriate plans, drawings and manuals, in accordance with workplace procedures and commissioning plan
  17. Wind turbine generator system is commissioned, in conjunction with other related systems and equipment, in accordance with workplace procedures and commissioning plan
  18. Wind turbine generator equipment is commissioned, in accordance with workplace procedures and commissioning plan
  19. Faulty wind turbine generator equipment is repaired or reported, in accordance with workplace procedures
  20. Final inspection is carried out, in accordance with workplace procedures and commissioning plan
  21. Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures
  22. Tools and equipment are maintained and stored, in accordance with workplace procedures
  23. Work completion details are finalised, in accordance with workplace procedures