Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Test wiring systems
  2. Plan and prepare for work
  3. Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, legislative requirements, industry standards, codes of practice, manufacturers’ specifications, environmental obligations and workplace procedures are reviewed in preparation for work
  4. Resources are obtained and inspected for compliance with job specification
  5. Relevant plans, drawings and manuals are selected and used, in accordance with workplace procedures
  6. Correct materials and components for work are obtained and inspected, in accordance with workplace procedures, for compliance with job specification
  7. Work is planned, sequenced and prioritised, in accordance with workplace procedures
  8. Potential hazards are identified, and risk control measures are selected and implemented, in accordance with workplace procedures
  9. Work area is prepared, in accordance with workplace procedures
  10. Wiring systems are tested, in accordance with workplace procedures, plans, drawings and manuals
  11. Wiring systems, including enclosures and supports, are inspected prior to testing, in accordance with workplace procedures, to ensure absence of damage, defects or deterioration
  12. Fixed wiring is tested, in accordance with workplace procedures, and results are documented to confirm compliance with job specification
  13. Test piping and tubing systems
  14. Piping and tubing systems are tested, in accordance with workplace procedures, plans, drawings and manuals
  15. Piping and tubing systems, including enclosures and supports, are inspected prior to testing, in accordance with workplace procedures, to ensure absence of damage, defects or deterioration
  16. Fixed piping and tubing is tested, in accordance with workplace procedures, and results are documented to confirm compliance with job specification
  17. Test instrumentationsystem
  18. Instrumentation system is tested, in accordance with workplace procedures, plans, drawings and manuals
  19. Test conditions are confirmed and instrumentation system is inspected, in accordance with workplace procedures, to ensure absence of damage, defects or deterioration
  20. Instrumentation system test results are documented to confirm compliance with job specification
  21. Commission instrumentation equipment
  22. Instrumentation system is commissioned, in accordance with workplace procedures, plans, drawings and manuals
  23. Instrumentation system is set up, in accordance with workplace procedures and manufacturers' specifications
  24. Testing and monitoring results are reviewed and documented, in accordance with workplace procedures, to ensure equipment operates within manufacturers' specifications