Elements and Performance Criteria
- Plan and prepare work
- Safety issues are identified, in accordance with workplace procedures, to comply with Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations and industry standards
- Work requirements are identified from appropriate personnel and documentation, in accordance with workplace procedures
- Local system operations plant status is confirmed, in accordance with workplace procedures and instructions
- Preoperational checks are carried out on local system operations plant, in accordance with workplace procedures and instructions
- Operate plant
- System components to be locally controlled are identified and operated, in accordance with workplace procedures and instructions
- Local system operations plant is operated within limits of its design specification and site requirements, in accordance with workplace procedures
- Local system operations plant is monitored, observed and tested, in accordance with workplace procedures, to detect deviations from normal operating conditions
- Work requirements are identified from appropriate personnel and documentation, in accordance with workplace procedures
- Local system operations plant status is confirmed, in accordance with workplace procedures and instructions
- Preoperational checks are carried out on local system operations plant, in accordance with workplace procedures and instructions
- Local system operations plant is operated within limits of its design specification and site requirements, in accordance with workplace procedures
- Local system operations plant is monitored, observed and tested, in accordance with workplace procedures, to detect deviations from normal operating conditions
- Complete documentation
- Documentation is updated, in accordance with workplace procedures