Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare for work
  2. Work, air conditioning plant and ventilation system and resource requirements are identified, in accordance with workplace procedures, and from relevant personnel and documentation
  3. Quality assurance requirements are identified, in accordance with workplace procedures
  4. Documentation to determine air conditioning plant and ventilation system status is assessed and evaluated, in accordance with workplace procedures
  5. Inspection and field preparation for air conditioning plant and ventilation system service is carried out, in accordance with workplace and manufacturers' procedures
  6. Air conditioning plant and ventilation system operational prerequisites are established, in accordance with workplace procedures and manufacturers' recommendations
  7. Sequence and air conditioning plant and ventilation system requirements for operation is determined, in accordance with workplace procedures and site requirements
  8. Reporting requirements are carried out, in accordance with workplace procedures
  9. Performoperation and monitoring of air conditioning equipment and ventilation systems
  10. Air conditioning plant and ventilation system is monitored and observed, in accordance with workplace procedures, to detect deviations from normal operating conditions
  11. Air conditioning plant and ventilation system performance and quality is monitored, in accordance with workplace procedures, including temperature and airflow humidity
  12. Corrective actions are taken to rectify abnormalities, in accordance with workplace procedures, industry standards and site requirements
  13. Test air conditioning and ventilation systemplant operation
  14. Corrective action is taken, in accordance with workplace procedures, when response does not meet with documentation, air conditioning and ventilation system plant integrity or personnel safety requirements
  15. Air conditioning plant and ventilation system is returned to required operational status upon completion of testing, in accordance with workplace procedures
  16. Identify air conditioning and ventilation systemplant faults
  17. Corrective action is taken, in accordance with workplace procedures
  18. Air conditioning plant and ventilation system integrity and personnel safety is maintained, in accordance with workplace procedures, and in consultation with appropriate personnel and technical and operational documentation
  19. Monitor and inspect air conditioning and ventilation system plant
  20. Air conditioning plant and ventilation system is monitored and inspected, in accordance with workplace procedures, for normal operation or to detect deviations
  21. Appropriate personnel are notified when defects are detected, in accordance with workplace procedures
  22. Complete documentation
  23. Documentation is updated, in accordance with workplace procedures