Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare work
  2. Work, bulk coal handling plant and resource requirements are identified from appropriate personnel and documentation, in accordance with workplace procedures
  3. Quality assurance requirements recognised and adhered to, in accordance with workplace procedures and industry standards
  4. Basic mineralogy information is applied, in accordance with workplace procedures and site requirements
  5. Work schedule is consistent with job requirements, in accordance with workplace procedures
  6. Pad is prepared for coal stockpiling, including removal of contaminants and drainage, in accordance with workplace procedures
  7. Preoperational checks are carried out on bulk coal handling plant, in accordance with manufacturers' recommendations and workplace procedures
  8. Sequence for recommissioning of bulk coal handling plant is determined, in accordance with workplace procedures
  9. Conduct operation of bulk coal handlingplant
  10. Bulk coal handling plant is operated, in accordance with workplace procedures and manufacturers' recommendations
  11. Bulk coal handling plant is monitored, in accordance with workplace procedures, to detect deviations from normal operating conditions
  12. Corrective actions are taken to rectify bulk coal handling plant abnormalities, in accordance with industry standards and workplace procedures
  13. Bulk coal handling plant to be removed from service is identified and isolated, in accordance with workplace procedures
  14. Inspection and fault finding are carried out, in accordance with manufacturers' recommendations and workplace procedures
  15. Coal is placed or bunkered down in predetermined stockpile location, in accordance with workplace procedures
  16. Reclaim specifications are received, despatch area is notified and equipment is made ready, in accordance with workplace procedures
  17. Specified coal is blended, loaded, sampled and despatched, in accordance with workplace procedures
  18. Test bulk coal handlingplant operation
  19. Bulk coal handling plant is observed for correct operational response, in accordance with workplace procedures
  20. Corrective action is taken when response does not meet with documentation, workplace procedures, bulk coal handling plant integrity or personnel safety requirements
  21. Bulk coal handling plant is returned to required operational status upon completion of testing, in accordance with workplace procedures
  22. Analyse bulk coal handling plantfaults
  23. Corrective action is taken, in accordance with workplace procedures
  24. Supplementary personnel are arranged for investigation of identified operational abnormalities, if required, in accordance with workplace procedures
  25. Inspect bulk coal handlingplant
  26. Bulk coal handling plant is inspected, in accordance with workplace procedures, to detect deviations from normal operating conditions
  27. Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected
  28. Complete documentation
  29. Documentation is updated, in accordance with workplace procedures