Elements and Performance Criteria
- Plan and preparefor boiler steam water cycle operation
- Work requirements, including permits to work, are identified, in accordance with workplace procedures, from appropriate personnel and documentation
- Documentation to determine boiler steam and water cycle plant status is assessed and evaluated, in accordance with workplace procedures
- Inspection, preoperational checks and field preparations for boiler steam and water cycle service are carried out, in accordance with workplace procedures and manufacturers' recommendations
- Boiler steam and water cycle plant operational prerequisites are established, in accordance with workplace procedures and manufacturers' recommendations
- Sequence for recommissioning of boiler steam and water cycle plant is determined, in accordance with workplace procedures and site requirements
- Operateboiler steam/water cycle plant
- Boiler steam and water cycle plant is monitored and observed, in accordance with workplace procedures, to detect deviations from normal operating conditions
- Corrective actions are taken to rectify abnormalities, in accordance with workplace procedures and industry standards
- Boiler steam and water cycle plant is identified and removed from service, in accordance with workplace procedures
- Corrective actions are taken, in accordance with workplace procedures when boiler steam and water cycle plant abnormalities are identified during removal from service
- Test boiler steam/water cycleplant operation
- Boiler steam and water cycle plant is observed for correct operational response, in accordance with workplace procedures
- Corrective action is taken, in accordance with workplace procedures, when response does not meet with documentation, boiler steam and water cycle plant integrity or personnel safety requirements
- Boiler steam and water cycle plant is returned to required operational status upon completion of testing, in accordance with workplace procedures
- Analyse boiler steam/water cycleplant faults
- Corrective action is taken, in accordance with workplace procedures
- Boiler steam and water cycle plant integrity and personnel safety are maintained, in accordance with workplace procedures, and in consultation with appropriate personnel and technical and operational documentation
- Monitor and inspect boiler steam/water cycleplant
- Boiler steam and water cycle plant is monitored and inspected, in accordance with workplace procedures for normal operation or to detect deviations
- Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected
- Complete documentation
- Documentation is updated, in accordance with workplace procedures
Range Statement