Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and preparefor boiler steam water cycle operation
  2. Work requirements, including permits to work, are identified, in accordance with workplace procedures, from appropriate personnel and documentation
  3. Documentation to determine boiler steam and water cycle plant status is assessed and evaluated, in accordance with workplace procedures
  4. Inspection, preoperational checks and field preparations for boiler steam and water cycle service are carried out, in accordance with workplace procedures and manufacturers' recommendations
  5. Boiler steam and water cycle plant operational prerequisites are established, in accordance with workplace procedures and manufacturers' recommendations
  6. Sequence for recommissioning of boiler steam and water cycle plant is determined, in accordance with workplace procedures and site requirements
  7. Operateboiler steam/water cycle plant
  8. Boiler steam and water cycle plant is monitored and observed, in accordance with workplace procedures, to detect deviations from normal operating conditions
  9. Corrective actions are taken to rectify abnormalities, in accordance with workplace procedures and industry standards
  10. Boiler steam and water cycle plant is identified and removed from service, in accordance with workplace procedures
  11. Corrective actions are taken, in accordance with workplace procedures when boiler steam and water cycle plant abnormalities are identified during removal from service
  12. Test boiler steam/water cycleplant operation
  13. Boiler steam and water cycle plant is observed for correct operational response, in accordance with workplace procedures
  14. Corrective action is taken, in accordance with workplace procedures, when response does not meet with documentation, boiler steam and water cycle plant integrity or personnel safety requirements
  15. Boiler steam and water cycle plant is returned to required operational status upon completion of testing, in accordance with workplace procedures
  16. Analyse boiler steam/water cycleplant faults
  17. Corrective action is taken, in accordance with workplace procedures
  18. Boiler steam and water cycle plant integrity and personnel safety are maintained, in accordance with workplace procedures, and in consultation with appropriate personnel and technical and operational documentation
  19. Monitor and inspect boiler steam/water cycleplant
  20. Boiler steam and water cycle plant is monitored and inspected, in accordance with workplace procedures for normal operation or to detect deviations
  21. Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected
  22. Complete documentation
  23. Documentation is updated, in accordance with workplace procedures