Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and preparefor water systems plant operation
  2. Work requirements including permit to work are identified, in accordance with workplace procedures, from relevant personnel and documentation
  3. Documentation to determine water system plant status is assessed and evaluated, in accordance with workplace procedures
  4. Inspection, preoperational checks and field preparation for water system plant service are carried out, in accordance with workplace procedures and manufacturers' recommendations
  5. Water system plant operational prerequisites are established, in accordance with workplace procedures and manufacturers' recommendations
  6. Sequence for recommissioning of water system plant is determined, in accordance with workplace procedures and site requirements
  7. Operate water systemplant
  8. Water system plant is monitored and observed, in accordance with workplace procedures, to detect deviations from normal operating conditions
  9. Corrective actions are taken to rectify water system abnormalities, in accordance with workplace procedures, industry standards and site requirements
  10. Test water systemplant operation
  11. Water system plant is observed for correct operational response, in accordance with workplace procedures
  12. Corrective action is taken when response does not meet with documentation, water system plant integrity or personnel safety requirements
  13. Water system plant is returned to required operational status upon completion of testing, in accordance with workplace procedures
  14. Analyse water systemplant faults
  15. Corrective action is taken, in accordance with workplace procedures
  16. Water system plant integrity and personnel safety is maintained, in accordance with workplace procedures, and in consultation with appropriate personnel and technical and operational documentation
  17. Monitor and inspect water systemplant
  18. Water system plant is monitored and inspected, in accordance with workplace procedures, for normal operation or to detect deviations
  19. Appropriate personnel are notified when defects are detected, in accordance with workplace procedures
  20. Complete documentation
  21. Documentation is updated, in accordance with workplace procedures