Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare work
  2. Work requirements are identified, in accordance with workplace procedures, from relevant personnel and documentation
  3. Documentation to determine wind generator plant status is assessed and evaluated, in accordance with workplace procedures
  4. Inspection and field preparations for wind generator plant service are carried out, in accordance with workplace procedures and manufacturers' recommendations
  5. Wind generator plant operational prerequisites are established, in accordance with workplace procedures and manufacturers' recommendations procedures
  6. Sequence for recommissioning of wind generator plant is determined to suit existing circumstances, in accordance with workplace procedures and site requirements
  7. Operate wind generatorplant
  8. Wind generator plant is monitored and observed, in accordance with workplace procedures, to detect deviations from normal operating conditions
  9. Corrective actions are taken to rectify wind generator plant abnormalities, in accordance with workplace procedures and manufacturers' recommendations
  10. Test wind generatorplant operation
  11. Wind generator plant is observed for correct operational response, in accordance with workplace procedures
  12. Corrective action is taken when response does not meet with documentation, wind generator plant integrity or personnel safety requirements
  13. Analyse wind generatorplant faults
  14. Corrective action is taken, in accordance with workplace procedures
  15. Wind generator plant integrity and personnel safety is maintained, in accordance with workplace procedures, and in consultation with appropriate personnel and technical and operational documentation
  16. Monitor and inspect wind generatorplant
  17. Wind generator plant is monitored or inspected, in accordance with workplace procedures, for normal operation or to detect deviations
  18. Appropriate personnel are notified when defects are detected, in accordance with workplace procedures
  19. Complete documentation
  20. Documentation is updated, in accordance with workplace procedures