Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
- Plan and prepare work
- Work, hydro generator synchronous condenser plant and type of start requirements are identified from appropriate personnel and documentation, in accordance with workplace procedures
- Turbine running up and loading schedule are ascertained from relevant documentation, in accordance with workplace procedures
- Hydro generator synchronous condenser plant inspection, preoperational tests and field preparation for service are carried out, in accordance with manufacturers' recommendations and workplace procedures
- Hydro generator synchronous condenser plant operational prerequisites are established, in accordance with manufacturers' recommendations and workplace procedures
- Sequence for recommissioning of hydro generator synchronous condenser plant is determined, in accordance with workplace procedures
- Operate hydro generator synchronous condenserplant
- Hydro generator synchronous condenser plant is monitored, in accordance with workplace procedures, to detect deviations from normal operating conditions
- Corrective actions are taken to rectify abnormalities, in accordance with manufacturers' recommendations and workplace procedures
- Test hydro generator synchronous condenserplant operation
- Corrective action is taken when response does not meet with documentation, hydro generator synchronous condenser plant integrity or personnel safety requirements
- Hydro generator synchronous condenser plant is returned to required operational status upon completion of testing, in accordance with workplace procedures
- Analysehydro generator plant faults
- Hydro generator synchronous condenser plant integrity and personnel safety is maintained, in accordance with workplace procedures, through consultation with appropriate personnel and technical and operational documentation
- Appropriate personnel are notified when defects are detected, in accordance with workplace procedures
- Complete documentation
- Documentation is updated, in accordance with workplace procedures
Range Statement