Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Required Skills
Evidence Required
Range Statement
|
10) This relates to the unit of competency as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.Plant and equipment may include: wind turbines, solar dishes, solar panels, transformers, electrical supply switchboards and overhead electrical lines.Civil assets may include: roads, fences, buildings and walkways.Weather and climate information may be sourced from: Radio, T.V., Internet, email, fax, telephone, newspapers, word of mouth and enterprise weather stations.Weather and climate conditions may include: fire, flood, wind, rain, hail, storm, cyclones, heat waves, snow, dust, frost, gale and rapid changes in temperature or weather conditions.Preventative actions may include: placing plant and equipment in safe mode, lowering wind turbine towers, changing load on equipment, change electrical load, securing equipment and buildings, preparing fire breaks, assuring water supply, rescheduling work tasks and moving personnel to safe locations.Safety standards may include relevant sections of Occupational Health and Safety legislation, enterprise safety rules, relevant state and federal legislation and environmental legislationInformation and documentation sources may include verbal or written communications; enterprise safety rules documentation; enterprise operating instructions; dedicated computer equipment; enterprise/site standing and operating instructions; enterprise log books; manufacturer operation and maintenance manuals; and equipment and alarm manuals.Communications may be by means of telephone, two way radio, pager, computer (electronic mail), operating log (written or verbal) and public address system.Appropriate personnel to consult, give or receive direction may include supervisor/team leader or equivalent, technical and engineering officers or equivalent, power system control personnel or equivalent; contractor and specialist personnel, maintenance staff and power plant operations personnel.Generic terms are used throughout this Training Package for vocational standard shall be regarded as part of the Range Statement in which competency is demonstrated. The definition of these and other terms are given in Section 2.1 Preliminary Information and Glossaries. |