Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare for switching operations
  2. Work requirements are identified, in accordance with workplace procedures, from appropriate personnel and documentation
  3. Documentation to determine A.C. electrical system plant status is assessed and evaluated, in accordance with workplace procedures
  4. Equipment inspection, preoperational checks and preparations for A.C. electrical system service are carried out, in accordance with workplace procedures and manufacturers' recommendations
  5. Switchboard and electrical equipment operational prerequisites and switching sequences are established, in accordance with workplace procedures and manufacturers' recommendations
  6. Carry out operation of switchgearand switchboards
  7. Isolation, removal and reinstatement of switchgear, switchboards and rectification system is carried out, in accordance with workplace procedures and manufacturers' recommendations
  8. Paralleling and balancing requirements are assessed to meet A.C. electrical system stability, in accordance with workplace procedures
  9. Rectification system is operated, isolated and reinstated, in accordance with workplace procedures and manufacturers' recommendations
  10. Test switchgear and equipment operation
  11. Switchgear and equipment is observed for correct operational response, in accordance with workplace procedures
  12. Corrective action is taken, in accordance with workplace procedures, when switch gear and equipment response does not meet with documentation, A.C. electrical system integrity or personnel safety requirements
  13. Switchgear equipment is returned to required operational status upon completion of testing, in accordance with workplace procedures
  14. Analyse A.C. electricalsystem, switchgear and equipment faults
  15. Corrective action is taken, in accordance with workplace procedures
  16. A.C. electrical system and switchgear plant integrity and personnel safety are maintained, in accordance with workplace procedures, and in consultation with appropriate personnel and technical and operational documentation
  17. Inspect and monitor A.C. electricalsystem and switchboards
  18. A.C. electrical system and switchgear is monitored and inspected, in accordance with workplace procedures, for normal operation or to detect deviations
  19. Appropriate personnel are notified when A.C. electrical system defects and abnormal operating conditions are detected, in accordance with workplace procedures
  20. Complete documentation
  21. Documentation is updated, in accordance with workplace procedures