Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare boiler unit start upwork
  2. Work requirements are identified from appropriate personnel and documentation, in accordance with workplace procedures
  3. Preoperational checks are carried out on boiler unit plant, in accordance with manufacturers' recommendations and workplace procedures and site requirements
  4. Conduct boiler unit start up
  5. Pre-light up conditions for boiler unit are established, in accordance with workplace procedures
  6. Combustion is established with fuel consumption kept at minimum levels, in accordance with workplace procedures and manufacturers' recommendations
  7. Fuel, air and feed water flows are adjusted, in accordance with workplace procedures, to achieve required steam conditions and demand
  8. Boiler unit plant is operated within limits of its' design, in accordance with workplace procedures
  9. Boiler unit plant is monitored, in accordance with workplace procedures, to detect deviations from required operating conditions
  10. Corrective actions are taken to rectify boiler unit abnormalities, in accordance with manufacturers' recommendations and workplace procedures
  11. Test boiler unitplant operation
  12. Power generation system and boiler unit plant is observed, in accordance with workplace procedures, for correct operational response
  13. Corrective action is taken, in accordance with workplace procedures, when response does not meet documentation, plant integrity or personnel safety requirements
  14. Boiler unit plant is returned to required operational status upon completion of testing, in accordance with workplace procedures
  15. Analyse system faultsduring boiler unit start up
  16. Corrective action is taken, in accordance with workplace procedures
  17. Boiler unit plant integrity and personnel safety is maintained, in accordance with workplace procedures and through consultation with appropriate personnel and technical and operational documentation
  18. Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected
  19. Complete documentation
  20. Documentation is updated, in accordance with workplace procedures