Elements and Performance Criteria
- Plan and prepare boiler unit shut down work
- Work requirements are identified from relevant personnel and documentation, in accordance with workplace procedures
- Preoperational checks are carried out on boiler unit plant in accordance with workplace procedures, manufacturers' recommendations and workplace procedures and site requirements
- Conduct boiler unit shut down
- Cool down and purge boiler unit, in accordance with manufacturers' specifications and workplace procedures
- Depressurise boiler unit, in accordance with manufacturers' specifications and workplace procedures
- Corrective actions are taken to rectify boiler unit abnormalities, in accordance with manufacturers' recommendations and workplace procedures
- Test boiler unitplant operation
- Power generation system and boiler unit plant is observed for correct operational response, in accordance with workplace procedures
- Corrective action is taken, in accordance with workplace procedures, when response does not meet with documentation, boiler unit plant integrity or personnel safety requirements
- Boiler unit plant is returned to required operational status upon completion of testing, in accordance with workplace procedures
- Analyse and report on system faults during boiler unit shut down
- Corrective action is taken, in accordance with workplace procedures
- Boiler unit plant integrity and personnel safety is maintained, in accordance with workplace procedures, and through consultation with appropriate personnel, and technical and operational documentation
- Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected
- Complete documentation
- Documentation is updated, in accordance with workplace procedures