Elements and Performance Criteria
- Plan and prepare steam turbine shut down work
- Work requirements are identified from appropriate personnel and documentation, in accordance with workplace procedures
- Turbine shut down schedule is identified from relevant documentation, in accordance with workplace procedures and site requirements
- Pre-shut down checks are carried out on steam turbine plant, in accordance with manufacturers' recommendations and workplace procedures
- Conduct steam turbine shutdown
- Steam turbine and generator are removed from the steam generation system, in accordance with manufacturers' recommendations and workplace procedures
- Steam turbine is placed on turning gear, in accordance with manufacturers' recommendations and workplace procedures
- Steam turbine is cooled down on turning gear, in accordance with manufacturers recommendations and workplace procedures
- Test steam turbine plant operation during shut down
- Steam generation system and steam turbine plant is observed, in accordance with workplace procedures, for correct operational response
- Corrective action is taken, in accordance with workplace procedures, when response does not meet documentation, plant integrity or personnel safety requirements
- Steam turbine plant is returned to operational status upon completion of testing, in accordance with workplace procedures
- Analyse and report on system faultsorstatus during steam turbine shutdown
- Corrective action is taken, in accordance with workplace procedures
- Steam turbine plant integrity and personnel safety is maintained, in accordance with workplace procedures, through consultation with appropriate personnel and technical and operational documentation
- Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected
- Complete documentation
- Documentation is updated, in accordance with workplace procedures
Range Statement