Elements and Performance Criteria

  1. Interpret requirements
  2. Area of planned outage is identified in consultation with appropriate personnel and use of power generation system diagrams, drawings and maps
  3. Work details are interpreted from outage request and draft switching program, in accordance with workplace procedures
  4. Research switching programme
  5. Types and function of switchgear to be operated are identified, in accordance with workplace procedures and their suitability for operation under forecast system conditions during scheduled outage is assessed
  6. System loadings, limitations and alternate supply route capabilities are evaluated, in accordance with workplace procedures to ensure system integrity
  7. Consultation with appropriate personnel affected by the switching programme is undertaken, in accordance with workplace procedures
  8. Location of isolation points are identified, in accordance with workplace procedures, to ensure shortest route when determining sequence of switching steps
  9. Safe working clearances are identified and maintained, in accordance with workplace procedures, and legislative requirements
  10. High Voltage (H.V.), Low Voltage (L.V.) and control circuitry is examined, in accordance with workplace procedures to ensure no back-feed is possible
  11. Draft switching program
  12. Permit to work procedures are implemented, if required, in accordance with workplace procedures
  13. Switching program is planned and implemented, in accordance with workplace procedures
  14. Switching program is checked for omissions, in accordance with workplace procedures
  15. All documentation supporting the switching program is completed, in accordance with workplace procedures
  16. Validate switching program
  17. Documentation is recorded, in accordance with workplace procedures