Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
- Plan and prepare work
- Operate HRSGplant
- Gas turbine exhaust flow and power output are adjusted, in accordance with workplace procedures and operating requirements, to achieve steam flow conditions
- Supplementary HRSG firing system, is placed into and out of service, as required, in accordance with workplace procedures, to maintain design steam flow and conditions
- Monitoring and control of HRSG drum level, feedwater flow, steam temperature, pressure and flow are carried out, in accordance with workplace procedures, manufacturers' recommendations and site requirements
- HRSG plant is operated within limits of its' design, and site requirements, in accordance with workplace procedures
- Corrective action is taken to rectify HRSG abnormalities, in accordance with workplace procedures and manufacturers' recommendations procedures
- Monitor HRSGplant
- Analyse HSRGfaults
- Work requirements are identified, in accordance with workplace procedures, from relevant personnel and documentation
- Operational checks are carried out on HRSG plant, in accordance with workplace procedures, manufacturers' recommendations and site requirements
- Supplementary HRSG firing system, is placed into and out of service, as required, in accordance with workplace procedures, to maintain design steam flow and conditions
- Monitoring and control of HRSG drum level, feedwater flow, steam temperature, pressure and flow are carried out, in accordance with workplace procedures, manufacturers' recommendations and site requirements
- HRSG plant is operated within limits of its' design, and site requirements, in accordance with workplace procedures
- Corrective action is taken to rectify HRSG abnormalities, in accordance with workplace procedures and manufacturers' recommendations procedures
- HSRG plant is monitored, in accordance with workplace procedures, for normal operation and/or to detect deviations from required operating conditions
- HSRG plant integrity and personnel safety is maintained, in accordance with workplace procedures, and in consultation with appropriate personnel and technical and operational documentation
- Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected
- Corrective action is taken, in accordance with workplace procedures
- Test HSRGplant operation
- HRSG plant is observed for correct operational response, in accordance with workplace procedures
- HRSG plant is returned to required operational status upon completion of testing, in accordance with workplace procedures
- Corrective action is taken, in accordance with workplace procedures, when response does not meet with documentation, HRSG plant integrity or personnel safety requirements
- Complete documentation
- Documentation is updated, in accordance with workplace procedures
Range Statement